Beavis & Bartels recently completed the installation of the inground component of the AJ Bush Bio Gas facility. The network of 280mm PE Bio Gas pipework interfaced with the Bio Gas Ponds and Bio Gas plant.

Included in the scope of works were upgrades to the existing Reverse Osmosis plant and interfacing with the new RO plant itself.

Client
AJ Bush
Primary Contractor:
WILEY
Timeline
May, 2014
Key Requirements
  • Environmental Factors
Capabilities
  • Design & Engineering
  • Hydraulics
  • Drainage
  • Water supply
  • Gas